Tree house books

Monday 23 April 2012

At floor level

Im at floor level now. The outer beam is inplace and the floor joists are Done.
As much as i love the rain,  its slowing me up. So im going to stretch a tarp over head using my mates scaffolding. The best scaffolding company in kent "by the way" canterbury scaffolding cheers steve!

Will be laying the insulation tomorow then the sub-floor. No more tight-rope walking.

The roller will hopefully arive from Usa tomorow so the trees can be finnished.
gona tint the final cement mix with some oxide powders and hopefully roll a tree bark texure into the cement.
Back soon.


No comments:

Post a Comment